Perfectly Coordinated – Bridge Demolition by the Specialists
Bridge Demolition
When bridges are scheduled for demolition, maximum speed and minimal disruption to traffic flow are of the utmost importance. That is why we coordinate personnel and machinery meticulously in advance. The individual work steps are closely interlinked—demolition excavators with concrete shears, excavators for processing recyclable materials, and the truck fleet for hauling away the demolished debris. Our fleet of machinery features state-of-the-art technology. The senior site manager, site manager, and machine operators are in constant communication with one another. This ensures that all work proceeds as smoothly as possible
Additional Services
- In-house disposal centers
- Protection of the roadway using bulk material delivered on-site

Ansprechpartner

Kurt Bicker
Dipl.-Ing. (FH)
Geschäftsfeldleiter Abbruch

Max Fus
Master of Engineering
Oberbauleiter Brückenabbruch
At a Glance























