Rosenstein Bridge in Stuttgart
Construction period
7 months
Client
Landeshauptstadt Stuttgart Marktplatz 1 70173 Stuttgart Deutschland
Construction Work
Demolition of the Rosenstein
Bridge: Scope and Special Features
- Preparatory Work: Lightening the Ribbed Slab
- Demolition of the 67-meter-long and 22-meter-wide bridge
- Demolition of a prestressed concrete bridge over the Neckar River in the heart of Stuttgart
- Floating and crane technology was used during the bridge’s demolition