Rosenstein Bridge in Stuttgart

Construction period

7 months

Client

Landeshauptstadt Stuttgart Marktplatz 1 70173 Stuttgart Deutschland

Construction Work

Demolition of the Rosenstein

Bridge: Scope and Special Features

  • Preparatory Work: Lightening the Ribbed Slab
  • Demolition of the 67-meter-long and 22-meter-wide bridge
  • Demolition of a prestressed concrete bridge over the Neckar River in the heart of Stuttgart
  • Floating and crane technology was used during the bridge’s demolition