Bridge over the A7 ST2021 between Finningen and Holzheim

Construction period

14 days

Client

Josef Hebel Construction Company
Riedbachstraße 9
87700 Memmingen
Germany 

Construction Work

Demolition of the ST2021 county road bridge over the A7 interstate highway between Holzheim and Finningen

Scope and Special Features

  • Installation of 1,000 m² of road protection
  • Use of 4 demolition excavators with an operating weight of up to 75 metric tons
  • Demolition of the bridge during a 10-hour full closure of the A7 at night
  •  Demolition of the bridge abutments during an 8-hour full closure of the A7 at night
  • Demolition and disposal of 20 metric tons of asbestos-containing waterproofing beneath the bridge caps
  • Disposal and removal of all demolition debris
  • Demolition of 750 m³ of bridge concrete