Facts and Figures

Construction period

January 2013 – July 2013

Client

Gemeinde Baienfurt
Marktplatz 1
88255 Baienfurt

Partic­ipants

Joint Venture with Max Bögl

Contract Amount

1,300,000.00 €

Brief description:

  • Approx. 11,000 m³ of excavation work for the basement and in the area of the pile heads
  • Construction of slope stabilization
  • Expert supervision by HPC Ravensburg
  • Approx. 30,000 metric tons of excavated material and drill cuttings disposed of
  • Max Bögl simultaneously carried out the construction of the concrete piles for the foundation