ZF Forum Friedrichshafen
Facts and Figures
Construction period
January 2013 – July 2013
Client
Gemeinde Baienfurt
Marktplatz 1
88255 Baienfurt
Marktplatz 1
88255 Baienfurt
Participants
Joint Venture with Max Bögl
Contract Amount
1,300,000.00 €
Brief description:
- Approx. 11,000 m³ of excavation work for the basement and in the area of the pile heads
- Construction of slope stabilization
- Expert supervision by HPC Ravensburg
- Approx. 30,000 metric tons of excavated material and drill cuttings disposed of
- Max Bögl simultaneously carried out the construction of the concrete piles for the foundation



