Renovation of the Former Zeuna-Stärker Site in Augsburg

Construction period

July 2023 through April 2024

Client

SOLIDAS Projektentwicklung GmbH
86368 Gersthofen

Brief Description

  • Remediation of zinc contamination using replacement drilling (approx. 4,000 m³ at 209 drilling points)
  • Deep compaction using vibro-compaction columns; repeated water exchange from boreholes
  • Soil replacement through surface removal and slide rail shoring (approx. 9,500 m³) 



Scope and Special Features

  • Establishment of a restricted access zone around the existing damaged area, including the installation of a temporary tire-washing station.
  • Continuous monitoring by explosive ordnance survey and archaeological teams throughout the entire construction period
  • Protection of groundwater outflow via diversion wells
  • Close monitoring of potential environmental impacts during construction (vibration, noise, dust, and groundwater monitoring)
  • Feeding groundwater from a replacement well into a water treatment plant