Demolition of the Elsen Bridge in Berlin
Construction period
August 2020 – November 2020
Client
TVF Berlin
Brief description:
- Lowering of two concrete bridge spans weighing approximately 850 metric tons using strand technology
Special features:
- Installation of external tendons
- Max Wild Special Steel Construction (strand-lift scaffold with strand-lift technology)
- Max Wild heavy-duty support scaffolding
- Edge-span supports using press technology




