Revitalization of the Clay Pit in Mengen
Construction period
From 2017 to the present
Client
Max Wild GmbH
Leutkircher Straße 22
88450 Berkheim
Leutkircher Straße 22
88450 Berkheim
Brief Description
Demolition and revitalization of the former brick factory production site.
Scope and Special Features
- Revitalization of the clay pit with a structural engineering feature to stabilize the existing excavation edge and convert the resulting residual area for subsequent use.
- Compensation under the Impact and Offset Regulation to create approximately 1.5 ha of shallow water zone and about 800 meters of flowing water
- Planting of 1,332 trees, shrubs, and bushes over approximately 3,500 m², and creation of a tall-shrub border over approximately 3,900 m²
- CEF measures to permanently safeguard ecological function