Reference Lists: Screening Plants

In 2015, approximately 200,000 metric tons were processed for the company’s own operations and on a contract basis.
In 2016, approximately 200,000 metric tons were processed for the company’s own operations and on a contract basis.
In 2017, approximately 200,000 metric tons were processed for both in-house and contract operations.

Processed Materials

  • Gravel from natural deposits in various grain size ranges from 08 to 45/150
  • Crushed stone from natural deposits in various grain size ranges from 0/8 to 45/150
  • Aeration and grading of humus 0–20
  • Asphalt RC in various gradations ranging from 0/16 to 0/45, with quality-controlled specifications
  • Concrete-RC in various gradations ranging from 0/10 to 0/45, with quality-controlled specifications
  • Construction debris RC in various gradations from 0/45 to 0/56, quality-controlled
  • Recycling of used ballast from railway construction projects
  • Recycling and separation of soil-construction debris mixtures
  • Processing and separation of old fill material consisting of soil, construction debris, and contaminated sites
  • Scrap metal and urban waste
  • Soil mixtures containing wood (shredder fractions)
  • Separation of oversized rock from natural deposits 0/45 45/X

Our Equipment

  • 1 EXTEC S4 tracked mobile double-deck screening plant (4.1 and 3.2 m² screening area)
  • 2 Keestrack “Frontier” tracked mobile double-deck heavy-duty screening plants (2 x 8.1 m² screening area; upper deck can also be equipped with a finger screen)

References

Municipal Operations

  • Altenstadt RC site: 150,000 metric tons of sand per year
  • Dornstadt RC site: 20,000 metric tons per year
  • Eichenberg RC site: 70,000 metric tons of track ballast per year
  • Eichenberg Reclaim Center: 150,000 metric tons per year
  • Heimertingen RC Site: 80,000 metric tons per year
  • Illerkirchberg RC site: as needed per year
  • Laubach RC site: as needed per year
  • RC site in Münsingen: 20,000 metric tons of limestone per year
  • RC site in Münsingen: 15,000 metric tons per year
  • Laubach RC site: as needed per year