New Günzburg District Court Building

Facts and Figures

Construction period

August 2013 – November 2013

Client

Staatl. Bauamt Krumbach

Contract Amount

530,000.00 €

Brief description:

  • Disposal of contaminated soil
  • Approx. 7,500 m³ of excavation material (backfill)
  • Formation of stockpiles and temporary storage pending classification

Disposal of:

  • Approx. 5,000 metric tons of a mixture of construction debris, concrete, and bricks > Z2 Bavarian Guidelines
  • Approx. 6,500 metric tons of excavated soil, Z1.2 to >Z2 Bavarian Guidelines
  • Approx. 300 metric tons of non-mineral waste