New Günzburg District Court Building
Facts and Figures
Construction period
August 2013 – November 2013
Client
Staatl. Bauamt Krumbach
Contract Amount
530,000.00 €
Brief description:
- Disposal of contaminated soil
- Approx. 7,500 m³ of excavation material (backfill)
- Formation of stockpiles and temporary storage pending classification
Disposal of:
- Approx. 5,000 metric tons of a mixture of construction debris, concrete, and bricks > Z2 Bavarian Guidelines
- Approx. 6,500 metric tons of excavated soil, Z1.2 to >Z2 Bavarian Guidelines
- Approx. 300 metric tons of non-mineral waste