Fire Station in Langenargen

Construction period

1 month

Client

Feuerwehr Langenargen 
Oberdorfer Str. 22
88085 Langenargen
Deutschland

Construction Projects

Partial Demolition and Removal of the Langenargen Fire Station

Scope and Specifics

  • Hazardous Material Remediation and Gutting
  • Mechanical Demolition
  • Disposal of 650 metric tons of mineral demolition debris
  • Demolition of the 25-meter-high hose tower
  • The existing building was not to be damaged