Münsingen Landfill Operations

On behalf of the City of Münsingen, we operate the “Kohl” inert waste landfill, which has a storage capacity of
approximately 500,000 metric tons of DK0 material, an operational period through 2020, and a storage volume of approximately 600,000 cubic meters,
with a 39-year

operational period. In addition, we operate a soil and construction waste treatment facility at this site for
the production of quality-certified recycled construction materials.

Client / Contractor:

Stadt Münsingen
Max Wild GmbH

Engineering Firm:

UW Umwelt-Wirtschaft, Stuttgart

Mass Balance / Year:

Approx. 30,000 metric tons of material for disposal
Approx. 10,000 metric tons of material for recycling / reclamation
Approx. 20,000 metric tons of material received / for processing
Approx. 20,000 metric tons of RC material as a secondary raw material
Annual revenue: approx. 500,000 €