Eichenberg Landfill Facility
At our Eichenberg site, we operate our own inert waste landfill (DK0) for the Biberach district, with
a landfill capacity of approximately 500,000 m³.
Operational through 2030
. We also operate a soil and construction waste treatment facility at this site to
produce quality-certified recycled construction materials.
Client / Contractor:
Max Wild GmbH
Mass Balance / Year:
Approx. 20,000 metric tons of material for recycling / reprofiling
Approx. 100,000 metric tons of material received / material for processing
Approx. 80,000 metric tons of RC material as a secondary raw material
Annual Revenue: