Demolition of the Heilbronn Neckar Valley Crossing
Construction period
March 2017 through August 2022
A6 West Construction Section: Brief Description
- 5 overpasses
- 3 underpasses, approx.
- 5 km of noise barriers 320,000 metric tons of reinforced concrete 22,000 metric tons of steel
Special Features
- Demolition of a steel bridge (3,000 metric tons) over the Neckar River using wire rope techniques and floating platforms (pontoons)
- Blasting demolition of a reinforced concrete bridge; conventional demolition using a cable excavator; segment-by-segment
- Excavation of bridge sections across the railroad tracks using a large crawler crane
- Demolition of bridge structures on the public transportation network (complete closure of the A6 / federal and county roads)
- Demolition within a limited time window
- Recycling: Crushing and processing of reinforced concrete to a particle size of 0/45 and removal of recycled material
- Recycling rate of 99%