Surface Sealing of the Ringgenbach Landfill
Facts and Figures
Construction period
Client
Leopoldstraße 4
72488 Sigmaringen
Contract Amount
Brief description:
- Approx. 10,000 m³ of waste relocation and installation in accordance with the slope profile
- Approx. 38,000 m² of surface grading
- Approx. 25,000 m² of asphalt waterproofing installation
- Approx. 12,500 m² of waterproofing installation using BAM-approved plastic waterproofing membrane (KDB 2.5 mm)
- Approx. 25,000 m³ of surface reclamation
- Approx. 11,500 m³ delivery and installation of FSS material graded to DKI
- Approx. 12,000 m³ delivery and installation of profiling material loaded to DKI
- Construction of a concrete structure for surface water collection, approx. 120 m³ UBR
- Construction of a concrete structure to cross the access road with a rough-bed foundation, approx. 20 m³ UBR
- Approx. 2,100 m² floor area; construction of strip and individual foundations for the hall of the future wood processing plant